Example: Iteration Plan
This is an example of an iteration plan for iteration 5 for a small team. In this example, the team has chosen not to list work items in the iteration plan. Instead, the team will search the work items list for work items assigned to iteration 5. This is the preferred solution when work items are managed in a tool that provides basic search capabilities.
Relationships
Related Elements
Description
Main Description

1. Key Milestones


Milestone Date
Iteration Start 7/1
EXPOWEST Demo 7/24
Iteration Stop 7/31




2. High-level Objectives

  • Address usability issues raised by the Order Management department.
  • Deliver key scenarios showcasing meaningful integration with SAP.
  • Enable early adopters to download and install new builds without requiring constant handholding by the development team.
  • Deliver a technical demo at EXPOWEST.

3. Work Item Assignments



Name / Description Priority Size Estimate (Points) Assigned To Effort estimate (hours)
Support simple inventory control 2 8 Lisa 70
Do the design Lisa, Ann, Johan 12
Implement and test server portion Ann 14
Implement and test client portion Johan 28
Update end user documentation Lisa 6
Produce demo for Supply Chain 2007 Conference 3 5 Ann 18
Edit end user documentation 2 5 Lisa 65

Edit install manual

2 1 Lisa 5

Edit release notes

2 1 Johan 4

Edit online help

3 2 Ann 22



4. Evaluation Criteria

  • 97% of system-level test cases passed.
  • Scenarios for Simple inventory control properly tested and demoed to key stakeholders.
  • End user documentation get favorable acceptance by end users.
  • Walkthrough of iteration build with Order Management and Financial Services departments are well received.
  • Favorable response to technical demo at Supply Chain 2007 Conference.