TDDD26 Development of Interactive Systems
Supervision meetings
All supervision meetings (Handledning in Timetable) will begin with a 5 min SCRUM. Then there will be aprox 25 min of discussion on a theme. You should prepare before the meeting by collecting your ideas and material that relate to the theme, and also think about questions you want to discuss with your supervisor.
It is Mandatory to participate in supervision meetings. If you for some reason cannot participate you should write 1 A4 page with discussion of the theme and questions for the meeting. This is handed in to the supervisor. If sent by e-mail it should be a text file or pdf file.
Meeting 1
Theme: Design workshop and interaction design
Questions
- How are you going to perform the Design workshop?
- How are you going to work with Interaction design during the project?
- What are the alternatives?
- Do you see any potential problems? How can you handle these?
Timeslots
| Time | Herbert Simon | Allen Newell |
| 8.15-8.50 | Group 1 | Group 2 |
| 9.15-9.50 | | Group 3 |
Meeting 2
Theme: Testing
Questions
- How are you going to perform the Acceptance test?
- How are you going to perform the Usability test?
- What are the alternatives?
- Do you see any potential problems? How can you handle these?
Timeslots
| Time | Herbert Simon | Allen Newell |
| 8.15-8.50 | Group 1 | Group 3 |
| 9.15-9.50 | | Group 2 |
Meeting 3
Theme: Brief Retrospective
Questions
- What worked well last Sprint that you should continue doing?
- What didn’t work well last Sprint that you should stop doing?
- What should you start doing?
- Do you need to change the project velocity?
Timeslots
| Time | Herbert Simon | Allen Newell |
| 8.15-8.50 | Group 1 | Group 2 |
| 9.15-9.50 | | Group 3 |
Meeting 4
Theme: Open
This is meeting is open for questions from the group. If you do not have any, you can cancel this supervision meeting by e-mailing you supervisor.
Timeslots
| Time | Herbert Simon | Allen Newell |
| 8.15-8.50 | Group 1 | Group 3 |
| 9.15-9.50 | | Group 2 |
Meeting 5
Theme: Reflections on project work
Questions
- What are the benefits of working with agile system development and participatory design methods?
- What are the drawbacks of working with agile system development and participatory design methods?
- How is work on design coordinated with and integrated in development work?
- Have you ran into any problems? What type of problems? How have they been solved?
Timeslots
| Time | Herbert Simon | Allen Newell |
| 13.15-13.50 | Group 1 | Group 3 |
| 14.15-14.50 | | Group 2 |